Text UsCall Now

Detached ADU Construction in Los Gatos, CA

Full design-build for a standalone backyard ADU or granny flat. From foundation to finish, we handle architecture, engineering, permits, and construction as a single accountable team.

Free EstimateDesign-Build Under One Roof
Detached ADU Construction in Los Gatos, CA

Detached ADU Construction in Los Gatos, California

Full design-build for a standalone backyard ADU or granny flat. From foundation to finish, we handle architecture, engineering, permits, and construction as a single accountable team.

What's Included

Custom architectural design tailored to your lot
Structural engineering and Title 24 energy compliance
Full site work: foundation, framing, roofing, utilities
Interior finish-out: kitchen, bath, flooring, fixtures
Single point of contact from design through final inspection
Fixed-price contract, no change-order surprises

Get a Free Detached ADU Construction Estimate

Message us now for a free consultation in Los Gatos, CA.

Our Detached ADU Construction Process

1

Free Site Consultation

We walk your property, review setbacks and lot coverage, and discuss your goals for the space.

2

Design & Engineering

Architectural plans, structural engineering, and Title 24 compliance package prepared for permit submission.

3

Permitting

We submit and manage the full permit process with the Town of Los Gatos and Santa Clara County.

4

Construction

Foundation through final finishes, with regular progress updates and a dedicated project manager.

5

Final Inspection & Handoff

City final inspection, walkthrough, and warranty documentation.

Frequently Asked Questions About Detached ADU Construction

How much does a detached ADU cost in Los Gatos?

A detached ADU in Los Gatos typically runs $250,000-$450,000+ depending on size, finish level, and site conditions. We provide a free, itemized estimate after an on-site consultation.

How long does it take to build a detached ADU?

Design and permitting typically take 3-5 months, and construction runs 5-8 months depending on size and complexity, for a total timeline of roughly 8-13 months from first consultation to move-in.

Detached ADU Construction Near You

We also provide detached adu construction in these nearby areas:

Free Detached ADU Construction Estimate

Serving Los Gatos and Santa Clara County

Text UsCall Nowinfo@aducontractorlosgatos.com
Licensed & Insured (CA)
Free ADU Consultation
Local Los Gatos ADU Experts
Design-Build Under One Roof

Ready for Detached ADU Construction in Los Gatos?

Message us today for a free consultation and estimate.

Mon-Fri 8AM-6PM, Sat 9AM-3PM